Rigs on MoveProjection Model
Rigs on Move presents Projection Model

Balance rig move demand with equipment and manpower supply.

Projection Model turns client-linked rigs, move assumptions, team resources, company pools, overrides, and utilization windows into one clear planning workflow.

Offering Flow

From master data to utilization decisions

The app follows how rig-move teams already think: define demand, define supply, then project where resources are covered, pressured, or idle.

01Master Data

Set up the planning language

Register clients, sales persons, rig types, contract types, team types, equipment types, and manpower positions once, then reuse them everywhere.

ClientsSales PersonsRig TypesTeam TypesEquipmentManpower
02Demand

Build each rig move profile

Assign rigs to clients and team types, then define average stay days, average move days, resource release days, and early-release rules.

Client A / RG00125 Stay Days9 Move DaysEarly ReleaseMove Team
03Supply

Load available company resources

Maintain company equipment and manpower pools so every projection compares fixed rig-move demand against the resources actually available.

Dolly Trailer: 6Winch Truck: 3Mobile Crane: 2Toolpusher: 4Signalman: 6
04Projection

See pressure, gaps, idle windows, and utilization

Run a projection to surface move coverage, shortage days, idle resources, suggested utilization windows, and the cockpit view for quick decisions.

Covered MovesPartial MovesGap DaysIdle ResourcesSuggested Utilization
Demand Side

Every rig becomes a resource profile over time.

Set current cycle dates, average location stay, move duration, team type, and early release behavior. The result is a fixed demand schedule that shows when each move needs equipment and manpower.

  • Link rig name/no. to client, sales person, rig type, contract type, and team type.
  • Capture average stay days, average move days, and resource release days.
  • Configure per-resource early release without changing the move schedule.
Rig move setup
Client A / RG001Move team · Active · Early release
Current Cycle01-Jan-2026Average Stay25 daysAverage Move9 daysRelease Days5 days
Company resource pool
Dolly Trailer6 available
Winch Truck3 available
Mobile Crane2 available
Toolpusher4 available
Lifting Supervisor4 available
Signalman6 available
Safety Officer3 available
Supply Side

Company resource pools make the projection honest.

Add available equipment and manpower once, then let each projection compare those pools against saved rig-move demand day by day.

  • Separate equipment capacity from manpower capacity.
  • Track inactive dependencies before they distort planning.
  • Export reports in Excel-ready format for planning reviews.
Projection Workspace

Demand and supply meet on the timeline.

Projection Model shows covered move days, red gap days, idle resources, override direction arrows, suggested utilization blocks, and drilldowns in one planning area.

January 2026February 2026March 2026
Client A / RG001
4 met · 0 gaps
Client B / RG002
4 met · 0 gaps
Client C / RG003
4 met1 day gapGap day: 18-Feb-2026Client C / RG003Missing resources:Mobile Crane: 1Safety Officer: 14 met
Idle resources
18 idle qty
Cockpit Dashboard

See what needs attention before the next planning meeting.

The cockpit surfaces projection health, next moves, dependency alerts, resource pressure, idle resources, suggested utilization time blocks, and readiness checks.

Projection HealthCovered, partial, uncovered
Resource PressureGap days and peak gaps
Dependency AlertsInactive records surfaced
Projection Model By Rigs On Move

Move from reactive resource checks to projection-led planning.

Give planners one place to register demand, maintain supply, run projections, intervene with overrides, and identify pressure and utilization opportunities.

Pricing

Start with a 15-day trial. No credit card. Cancel anytime.

Choose the planning capacity that matches your rig move volume. Subscription price is based on the number of rigs included in each tier.

Starter

USD 10/month per rig

USD 100/month total for 10 rigs

USD 8.50/month per rig

Yearly total: USD 1,020/year · Save 15%

Small teams validating rig move demand and supply planning.

  • 3 users other than admin
  • 10 clients
  • 10 rigs
  • 10 projection runs/month
Sign Up
Professional

USD 10/month per rig

USD 500/month total for 50 rigs

USD 8.50/month per rig

Yearly total: USD 5,100/year · Save 15%

Operating teams managing active rig move projections and utilization.

  • 10 users other than admin
  • 50 clients
  • 50 rigs
  • 50 projection runs/month
Sign Up
Enterprise

USD 10/month per rig

USD 2,500/month total for 250 rigs

USD 8.50/month per rig

Yearly total: USD 25,500/year · Save 15%

Large operations needing higher limits and commercial support.

  • 50 users other than admin
  • 250 clients
  • 250 rigs
  • 250 projection runs/month
Sign Up
Contact Sales

Custom Deal

Need larger limits, a special commercial setup, or an enterprise rollout path? Send the request to the platform owner.

  • Custom users, rigs, and projection runs
  • Company-specific commercial setup

Contact Sales

Tell Rigs on Move what limits or commercial setup you need. We will keep this as a sales lead only; it will not create a company or subscription.

Preparing bot protection...
FeatureStarterProfessionalEnterpriseContact Sales
Users Other Than Admin3 users10 users50 usersCustom
Clients10 clients50 clients250 clientsCustom
Rigs10 rigs50 rigs250 rigsCustom
Projection Runs / Month10 runs50 runs250 runsCustom
No-Card Trial15 days15 days15 daysCustom
Yearly PricingUSD 8.50/month per rig · USD 1,020/year total · Save 15%USD 8.50/month per rig · USD 5,100/year total · Save 15%USD 8.50/month per rig · USD 25,500/year total · Save 15%Custom